House under renovation with ceiling framing and plastered walls

The build part

Built byour own team.

The studio that designs the space also builds it. Each trade is planned against the working drawings and checked against them on site.

Structural works
01

Structural works

Changes to walls, beams, columns and slabs, from a new opening to a full extension, carried out to the drawings.

  • Wall hacking and new openings
  • Beams, columns and slabs
  • Extensions
  • Brick and block walls
Electrical
02

Electrical

New wiring, points and lighting laid out to the electrical drawing, so every switch and socket is where you planned it.

  • Rewiring
  • Power and switch points
  • Lighting and cove lights
  • Distribution board
Plumbing
03

Plumbing

Water supply and drainage for kitchens, bathrooms and wet areas, set out and tested before the tiles go on.

  • Water supply piping
  • Drainage and floor traps
  • Concealed mixers
  • Waterproofing
Ceiling
04

Ceiling

Plaster ceilings with clean lines, cove and recessed lighting, and access panels where they are needed.

  • Plaster ceilings
  • Cove and recessed lighting
  • Bulkheads
  • Access panels
Doors and windows
05

Doors and windows

Doors, windows and sliding systems fitted to their openings and sealed and finished properly.

  • Aluminium windows
  • Sliding doors
  • Timber doors
  • Frames and grilles
Painting
06

Painting

The last layer: walls and ceilings prepared, primed and painted to a clean, even finish.

  • Surface preparation
  • Walls and ceilings
  • Feature finishes
  • Touch-ups at handover

Start a project

Have a spacein mind?

Send us your floor plan and a few photos of the site. We will come back with the next step.

Send an enquiry →WhatsApp Erzeth